Bath Projects Gallery
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Basement Bathroom Remodel Project. These customers wanted to update their 1980's basement bathroom with a modern, clean, versatile look, while maintaining a reasonable budget. Pioneering Project Management, LLC took on the challenge, and (hopefully!) delivered exactly what these patient customers wanted. Pioneering PM took the walls down to the studs (in most places), took up the old flooring, and removed the old rusty drop ceiling, while preserving the existing shower surround and sink vanity. New luxury vinyl Armstrong Alterna flooring, a new custom drop ceiling, new exhaust fan, new drywall, and over 80+ sq ft of new subway tile breathed new life into the existing footprint. Capped off with new shower/sink fixtures and the re-conditioned original light fixtures, this bathroom is ready for everyday use for years to come. Thank you again for letting Pioneering PM help with this project, and I look forward to working with you again!
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
A special project Pioneering PM recently completed for a laundry and 1/2 bathroom area. The new first-time home owners wanted to remodel the laundry & 1/2 bath areas with new flooring, paint, vanity, and some special accent backsplash tiles. The home owners handled the painting, the molding stain & installation, and the vanity/countertop, while Pioneering helped with the flooring and natural stone backsplash installation. Luxury vinyl plank flooring flows through throughout the laundry into the 1/2 bath, while the natural rough-cut river stone backsplash seamlessly flows onto the entire mirror wall in the 1/2 bath. Working hand-in-hand with the home owners (with extra special help from their two kids), Pioneering PM is especially proud of this project and how well it turned out. Thanks again to Mel and Dar for letting Pioneering PM help, and can't wait for the next project!
![]() |
---|
![]() |
![]() |
Tired of your clunky shower doors? Pioneering PM can remove them, and retrofit your shower to accommodate a shower curtain rod instead. Why not also upgrade to a curved shower curtain rod for that surprisingly enjoyable extra room in the shower. These satisfied customers now have all the extra "elbow room" that they want, and don't have to worry about climbing through old dingy clunky doors too.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
A recent Bathroom Update project with many moving parts! The customer wanted quite a few items added to her master bathroom, such as a replacement exhaust fan, new custom ceiling fan above the garden tub, new towel racks, new toilet paper holder, new shelving above the toilet, and two new light fixtures about the "his" and the "her" vanities. Then came the last minute additions to the project: the removal of the shower doors & hardware along with New Artisan Spanish accent subway tiles & grout above the shower surround. Thank you Karen & Stan for letting Pioneering PM help again, this time in your master bath!
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() |
A recent renovation project for a Master Bedroom and an attached Bathroom. The Bathroom needed some wall patching/repair, a new lighting option, and a new floor. The Bedroom, after the removal of some worn carpeting, needed a new floor. Pioneering PM patched/repaired the bathroom's walls, painted, installed a new mirror and light fixture, and reinstalled all fixtures. The final touch was the installation of luxury vinyl plank flooring and quarter-round molding which carries quite nicely from Bedroom into the renovated Bathroom. The new flooring flows throughout the Bedroom, into it's closet, and meets the hallway at a new metal threshold. These upgrades really enhanced and modernized the look and feel of these two rooms. Thank you again Karen for letting Pioneering PM help with this project.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Bathroom Floor & Vanity Project. These customers wanted an easy/quick upgrade to their old bathroom flooring with new variable length/width luxury vinyl plank flooring. A quick installation, new painted trim, and a replacement vanity w/sink really freshened up this bathroom. Nice contrast with the existing fixtures and definitely upgraded this room! Thanks again you two for entrusting Pioneering PM with your project, and I look forward to the next one!